The possibility was evaluated to obtain rather uniform broccoli crops on an homogenous area in the period October to June.
On the basis of results from trials concerning 106 different treatments, a simulation was performed by dividing crop area into suitable plots to which each of above treatments were applied.
This allowed greater crop variability over the time period under exam.
On the basis of results from trials concerning 106 different treatments, a simulation was performed by dividing crop area into suitable plots to which each of above treatments were applied.
This allowed greater crop variability over the time period under exam.