Articles

SCHEDULING OF UNIFORM PRODUCTION OF BROCCOLI (BRASSICA OLERACEA VAR. ITALICA PLENCK) FOR PROCESSING

Article number
533_62
Pages
497 – 504
Language
Abstract
The possibility was evaluated to obtain rather uniform broccoli crops on an homogenous area in the period October to June.
On the basis of results from trials concerning 106 different treatments, a simulation was performed by dividing crop area into suitable plots to which each of above treatments were applied.
This allowed greater crop variability over the time period under exam.

Publication
Authors
S. Vannella, G. Damato, V.V. Bianco
Keywords
planning production, continuous production
Full text
Online Articles (75)
Peter J. Stoffella | M. Ozores-Hampton | David T. Patterson
F. Saccardo | E. Campiglia | R. Mancinelli | P. Crinò | P. Vitale
D. Di Venere | N. Calabrese | V. Linsalata | A. Cardinali | V.V. Bianco
V. Bjelic | L.N. Stankovic | R. Pavlovic
F. Benoit | N. Ceustermans | J.H. Bae
Gy. Varga | L. Barta | J. Dimény | L. Helyes
M.E. Ferreira | A. Ferreira | L. Andrada | A.A. Monteiro | J.P. de Melo Abreu | V.V. Bianco
C.A.P. van Wijk | R. van den Broek