DEFINING INTERNAL TRANSPORT SYSTEMS IN GREENHOUSES
Article number
295_29
Pages
233 – 242
Language
Abstract
Fundamental characteristic factors which can describe and relate the components of the greenhouse system have been developed for the general situation of a gutter connected, multi-bay greenhouse.
Parameters were determined to describe the working characteristics of laborers and machines.
Time-based performance parameters such as utilization efficiency of transporter and machines were developed.
System parameters such as total operation time and average cycle time were developed for the labor/machine/layout configuration.
These parameters may be utilized for the feasibility and design of greenhouse systems.
Parameters were determined to describe the working characteristics of laborers and machines.
Time-based performance parameters such as utilization efficiency of transporter and machines were developed.
System parameters such as total operation time and average cycle time were developed for the labor/machine/layout configuration.
These parameters may be utilized for the feasibility and design of greenhouse systems.
Publication
Authors
G.A. Giacomelli, W. Fang, K.C. Ting, P. Weel
Keywords
mechanization, labor, layout, materials handling